9.3 Management Review [ISO 9001 Template]

What Is A Management Review For ISO 9001?

Why Reinvent The Wheel?

Our Management Review Template is proven to work.
icon of templates

Why Have Management Review Meetings?

  • Evaluate the quality management system's continuing suitability, adequacy, and effectiveness
  • Define a quality policy
  • Create a plan with relevant objectives
  • Implement the system according to the plan
  • Audit, monitor, and measure performance against the plan
  • React to your findings

The ISO 9001 management review clauses provide a crucial opportunity for businesses to formally evaluate the adequacy and effectiveness of their quality management system. By discussing the agenda and making informed decisions based on analyzing performance data and metrics, businesses can institute corrective actions and ensure the QMS remains aligned with its strategic direction.

By considering each section of your management system at the review meeting, top management can decide what changes must be made (if any) to ensure the management system continues to work effectively.

Management Reviews Show Evidence‐based Decision-making

Management reviews meetings are done best when they follow a simple, defined, and documented process that ensures that all aspects are covered and suitable records are maintained.

These are some actions you can take to enhance evidence‐based decision-making:

1. Determine, measure, and monitor key indicators to demonstrate performance
2. Ensure all data needed is available to the relevant people to analyze
3. Ensure that data and information are sufficiently accurate, reliable, and secure
4. Analyse and evaluate data and information using suitable methods
5. Ensure people are competent to analyze and evaluate data as needed
6. Make decisions and take actions based on evidence, balanced with experience and intuition

External auditors will expect to see evidence of a more strategically focused management review meeting, where context, risks, and opportunities are considered, as well as the alignment of the quality management system to your organization’s overall strategic objectives.

photo of a female technician at work

Who Should Be Involved With Management Review Meetings?

Top management involvement in the management review meeting, preferably as chairperson, is fundamental to the success of the quality management system. Process owners appropriate to the meeting agenda must attend the management review meeting, such as the Purchasing Manager, the Quality Manager, the HR Manager, and Department Managers, as well as Directors and Executives, who are considered Top management.

The management review meeting should include representation from Top management, functional managers, line managers, process owners, and action owners. This is an activity that Top management should conduct in alignment with the organization's strategic direction. Its purpose is to review information on the performance of the quality management system to determine if it is:

  • Suitable (fit for purpose)
  • Adequate (meets the needs of the organization)
  • Effective, refer to ISO 9001:2015 Clause 4.4 (achieves intended results)

Each manager should prepare a departmental report to circulate before the meeting, which summarizes aspects of your organization’s performance.

Role Reporting
Managing Director (Chairperson) Strategy and policy
Audit Coordinator Audit results
Quality Manager (Minutes) Objectives achievement, monitoring, and measuring
Purchasing Manager Performance of external providers
Engineering Manager Nonconformities and corrective actions
Production Manager (Notes) Conformity of products and services
Human Resources Manager Adequacy and competence of human resources
Marketing Manager Feedback from relevant interested parties
Sales Manager Orders, workflow performance

How Often Should We Schedule A Management Review?

Scheduling a management review meeting with a one-year frequency is an absolute minimum, as the process is driven by the continuous assessment of the risks related to internal and external changes and performance-related issues. Annual management review meetings are insufficient in frequency to be able to react to any issues effectively.

Every time management staff convene to review and react to performance, it should be considered a management review meeting and documented, e.g., agenda, minutes, or action list. Whether they are reviewing an individual's performance, departmental programmes, production rates, etc., this should be considered a valid management review meeting.

Performance metrics must be monitored with varying frequencies, e.g., hourly, daily, weekly, and monthly. To manage this, some companies operate multiple review levels, whereby each review may require multiple subjects and rely upon multiple metrics as inputs, with the entire review cycle of the quality management system occurring annually.

Sometimes, subjects are reviewed at multiple levels, e.g., production numbers might be reviewed by the Production teams during daily production meetings and then by Senior management, possibly during weekly quality review meetings. Top management might conduct weekly meetings to review metrics and objectives to determine if any corrective action is required.

The frequency of management reviews might be weekly, monthly, quarterly, six-monthly, or annually. You may decide to have stand-alone management reviews or combine them with other business activities, e.g., strategic planning, business planning, operations meetings, process reviews/councils, or functional reviews. Annual management reviews are inadequate!

photo of a female technician at work

What Is A Management Review Program?

If you are setting up your business’s management review program, we suggest that, as part of a risk-based approach to managing the flow of review information, you subjectively rank each management review agenda item. The more critical review inputs that are likely to affect the customer or business, as denoted in the table below, are reviewed and actioned at an increased frequency. This will help you set the frequency and plan the content of future management reviews.

Agenda Item (9.3.2) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Actions from previous meeting ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Changes to the QMS ✓ ✓
Performance of the QMS ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Customer satisfaction ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Quality objectives ✓ ✓ ✓ ✓
Product conformity ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
NCR/CAR root-causes ✓ ✓ ✓ ✓
Monitoring results ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓
Internal audit results ✓ ✓
External providers ✓ ✓ ✓ ✓
Resources required ✓ ✓ ✓ ✓
Actions to address risk ✓ ✓
Improvement actions ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓

Using a risk-based approach to managing the flow of review information, your organization should operate multiple, regular review levels, whereby more critical review inputs that are likely to affect the stakeholder or business are reviewed and actioned more frequently (e.g., daily/weekly). In contrast, inputs less likely to affect the customer or business are reviewed and actioned less frequently (e.g., quarterly/six-monthly).

Based on this premise, the management review meetings should be phased so that the formally required inputs to management reviews are fully addressed.

Critical agenda items, such as; process performance, product conformity, and monitoring and measuring results, should be reviewed regularly. In contrast, less critical agenda items, such as reviewing the objectives, should be undertaken quarterly.

It is up to your organization to set the format, frequency, and intervals of the review, as long as fresh information is dealt with at each meeting, regardless of the intervals. Suppose a deficiency is discussed in one meeting. In that case, the assumption should be that the results and action items pertaining to it will be addressed at the next meeting to ensure an ongoing continuum through the agenda.

photo of a female technician at work

What Needs To Be Monitored And Measured?

First, study what top management already does to periodically review the quality management system's performance. Appropriate data is determined, collected, and analyzed to demonstrate the suitability and effectiveness of the quality management system and to evaluate where continual improvement of the effectiveness of the system can be made.

The organization should use data to evaluate where the effectiveness of the quality management system can be improved using the documented output of the analysis and evaluation process.

Analyzed data is an input for:

  • Improvement process
  • Performance meeting (short term)
  • Management review
  • Proof of process control during external audits

Ensure that the processes requiring statistical control have been identified and that data capture instructions, such as procedures, quality control plans, data collection sheets, data acquisition software, sampling techniques, and frequency, are communicated and actioned.

photo of a female technician at work

9.1.3 What Must be Evaluated During Management Review Meetings?

Subparagraphs of ISO 9001:2015 Clause 9.1.3 provide a clear framework of what needs to be analyzed and evaluated during the management review meeting in order to demonstrate the conformity of products and services, ensure conformity of the quality management system, and continually improve system effectiveness.

Organizations should analyze and evaluate appropriate data and information arising from the results of monitoring and measurement activities (9.1.3) as input to the management review process (9.3). Verify that your organization analyses and evaluates:

  • Conformity of products and services
  • The degree of customer satisfaction
  • The performance and effectiveness of the quality management system
  • If planning has been implemented effectively
  • The effectiveness of actions taken to address risks and opportunities
  • The performance of external providers
  • The need to improve the quality management system

Subclause 9.1.3 requires businesses to analyze and evaluate data and information obtained either internally about the quality management system and the characteristics of its operational process or externally about the performance of its suppliers and the satisfaction of customers.

Organizations must demonstrate that they use the output from their analysis and evaluation processes to identify operational trends, underperformance areas, and improvement opportunities (e.g., increasing efficiency and effectiveness).

This requires knowing what needs to be analyzed and evaluated, and the answer is specific to your products, services, and operational scenario (e.g., customers, contracts, context, etc.). An easy way to understand what needs to be analyzed and evaluated is to start asking:

  • What must I measure to get the data needed to analyze and evaluate?
  • How will I measure and get that data? E.g., remote sensor monitoring, inspections?
  • When do I get this data? (How often);
  • To whom do I communicate the data analysis? E.g., customer, regulator, management?

The organization should employ appropriate tools and techniques to support this activity. The analysis and evaluation results should be made available to the top management for review (See 9.3) and to evaluate any identifiable characteristics or trends that could potentially lead to a nonconformity.

photo of reading glasses and screens of computer code

How Is It Best To Document The Management Review Meeting?

What is the best way to document the management review meeting? After all, what good is the management review process if the outputs are not documented and communicated? The management review may not necessarily result in any change to the quality management system or its documentation. However, the process will still generate documented evidence that the review occurred and the right people attended it, in the form of:wwdwdw

  1. Presentations, reports, and hand-outs
  2. Signed attendance register
  3. Agenda
  4. Meeting minutes
  5. Action list (list of actions with owners, resources, and timescales, if any)

The management review meeting outcomes and actions must be reported to your employees. Copies of staff meetings communicating the outcomes and actions should be cross-referenced with the relevant management review minutes, etc.

The action item list and minutes must be sent to absent members afterward, and an opportunity for review and comment must be given. Any comments, changes, or additional inputs from these individuals must be incorporated into the final minutes or issued as a separate addendum.

The documentation will help your organization stay on top of assigned decisions, actions, and action items. The documents provide a trail for identifying trends and provide evidence that the management review process is working to improve quality performance. That is why management review meeting documentation is necessary and required.

  • Management review meeting presentation
  • Management review meeting action log and tracker
  • Management review meeting minutes
  • Management review meeting agenda

More information about our Management Review Template.

photo of reading glasses and screens of computer code

9.3.2 Management Review Inputs

The subparagraphs of ISO 9001:2015 Clause 9.3.2 provide a framework of inputs for management review meetings that should be adapted to meet the needs of your QMS. These are expanded upon below. The management review process must ensure that the necessary information is collected ahead of time to allow management to carry out this evaluation on the following topics effectively:

  • 9.3.2a Status of actions from the previous meeting
  • 9.3.2b Changes in external and internal issues
  • 9.3.2c Performance and effectiveness of the QMS
  • 9.3.2d Adequacy of resources
  • 9.3.2e Effectiveness of actions to address risks and opportunities
  • 9.3.2f Opportunities for improvement

The results of the analysis and evaluation (Clause 9.1.3) should be made available to the top management for review in order to evaluate any identifiable characteristics or trends that could potentially lead to a nonconformity.

Ideally, review facilitators (often the Chairperson or the Management Representative) will guide the meeting, but the individual process owners of the topic being discussed should present and discuss the data being reviewed.

photo of reading glasses and screens of computer code

What is the Management Review Meeting Agenda?

The inputs required for the management review process must be clearly defined as an agenda for each meeting. By considering each section of the QMS at the review meeting, management can decide what changes must be made (if any) to ensure the system will continue working effectively.

The management review meeting agenda must include:

  • 9.3.2a Status of actions from the previous meeting
  • 9.3.2b Changes in external and internal issues
  • 9.3.2c Performance and effectiveness of the QMS
    • 9.3.2c1 Customer satisfaction and feedback
    • 9.3.2c2 Achievement of objectives
    • 9.3.2c3 Process performance and conformity of products and services
    • 9.3.2c4 Nonconformities and corrective actions
    • 9.3.2c5 Monitoring and measurement results
    • 9.3.2c6 Audit results
    • 9.3.2c7 Performance of external providers
  • 9.3.2d Adequacy of resources
  • 9.3.2e Effectiveness of actions to address risks and opportunities
  • 9.3.2f Opportunities for improvement.

The above should be considered the minimum information that should be covered during a typical management review meeting; a monitoring system should be in place, with criteria that trigger special unplanned management review activities.

Following each formal presentation, the participating managers discuss the issues and compare their status and performance with preceding periods to identify areas where improvement is required.

Enhanced details for management review input requirements, including those related to cost of poor quality, effectiveness, efficiency, conformance, feasibility assessments, customer satisfaction, performance against maintenance objectives, warranty performance, review of customer scorecards, and the identification of potential field failures through risk analysis.

9.3.2a Status Of Actions From The Previous Meeting

The outputs of the previous management meeting (action items) become inputs to the next meeting. Status of actions from previous meeting (open/closed) from previous meeting(s), the aging profile of open actions:

  • Management review action log
  • Minutes from previous management review meeting
  • Provide a brief background on any areas of concern

Refer to the minutes from the previous meeting. For items that are still open, transfer to new actions on the last page with appropriate comments.

9.3.2b Changes In External and Internal Issues

Changes in external and internal issues that are relevant to the quality management system (Clause 4.1), changes to internal/external requirements, e.g., policies, relevance of climate change, processes, procedures, methods, instructions, contracts, regulation, legislation, that impact the quality management system:

  • Changes to requirements to which the organization subscribes, such as customer requirements, statutory and regulatory requirements, and ISO 9001 requirements
  • Market-related factors such as technology, research and development, and competitor performance
  • Operational structure changes
  • The relevance of climate change
  • Other factors that may impact the organization, such as financial, social, or environmental conditions
  • Analysis of organizational structure and the effectiveness of previous changes.

Highlight any product, process, capacity, or other operational or organizational changes that affect the quality management system, and propose specific actions to update or modify the system in response to these changing circumstances.

9.3.2c Performance And Effectiveness Of The QMS

Information on the performance and effectiveness of the QMS (Clause 4.4), data analysis of trends to identify strengths, weaknesses, and opportunities for improvement in:

  • Nonconformities and corrective actions
  • Monitoring and measurement results
  • Audit results (Internal/External/Registrar/Customer/Supplier)

Assemble inspection reports, nonconformance reports, and corrective measures. Include corrective action implementation and effectiveness data.

9.3.2c1 Customer Satisfaction And Feedback

Customer satisfaction and feedback from relevant interested parties (Clause 9.1.2), e.g., interviews, questionnaires and surveys, report cards, indicators, ratings, complaints, and compliments arising from:

  • Stakeholder complaints
  • Quality complaints
  • Customer satisfaction surveys
  • Employee satisfaction surveys
  • Employee suggestions
  • Supplier audit
  • Supplier plant visits

Discuss customer feedback, customer satisfaction survey results, staff suggestions, and complaints, including analysis of trends for particular categories.

9.3.2c2 Achievement Of Objectives

The extent to which the quality objectives have been met (Clause 6.2), the status of planned versus actual achievement, and the relevance of the quality management system policy (Clause 5.2):

  • Analysis and action plan if the target is not met or the trend is negative
  • Ensure the objectives are part of KPIs
  • Ensure that targets are properly assigned for the KPIs

Include an assessment of the attainment of the corporate vision and mission, and any strategic or business plans. The quality policy should be available and reviewed by management to ensure that it is still suitable for the organization. Changes in business activities may prompt a change in the quality policy and/or the quality objectives.

Quality objectives established during the review must be systematically evaluated to assess progress. Objectives that have been achieved may be upgraded to a higher performance level or closed out to free resources for improvement in another area.

When objectives are not achieved on time, the review investigates and determines the causes of the failure to achieve the objectives. New objectives are established where it is necessary to improve performance for the quality management system to fulfil the policy or other organizational goals or aspirations. New quality objectives are documented in the review minutes.

9.3.2c3 Process Performance And Conformity Of Products And Services

Product conformity looks at product defects, error trends, first pass quality, and field issues. Process performance and conformity of products and services (Clauses 4.4, 8.6 & 8.7):

  • On-time delivery
  • Cost of quality
  • Supplier performance
  • Inspection status
  • Corporate goals and objectives

Assemble inspection reports, nonconformance reports, and corrective measures. Include corrective action implementation and effectiveness data.

9.3.2c4 Nonconformities And Corrective Actions

Nonconformities and the status of corrective actions (Clause 10.2), e.g., analysis of nonconformity by type, process, area, root cause, etc.:

  • CAR Log
  • NCR Log
  • Accident logs
  • Emergency situations
  • Management review action items list

Review findings for trends and underlying issues.

9.3.2c5 Monitoring And Measurement Results

Analysis of appropriate data (Clause 9.1.3) arising from monitoring and measurement (Clause 9.1.3) to evaluate trends in metrics and performance:

  • Performance indicators
  • Inspection and test results
  • Stakeholder satisfaction
  • Accident statistics
  • Process performance
  • Product and process characteristics
  • Supplier performance.

Highlight the accomplishments of the goals, their effect within the organization, the improvement they have contributed to the results, and any problems encountered in their achievement.

9.3.2c6 Audit Results

Audit results (Clause 9.2), e.g., achievement of the audit programme, areas of good practice, nonconformity profile (number, type, process, area, significance), the status of corrective action, audit close out, external audit findings:

  • Internal quality management system audits
  • Process and product audits
  • Regulatory audits
  • Registrar audits
  • Internal audit schedule
  • Opportunities for improvement.

Evaluate all audit reports collectively to uncover trends or OFIs that are not apparent in the individual audit reports, including any results from other audit activities such as third-party inspections, customer visits, and supplier audits. Provide a comparative analysis of previous audit results with trends of nonconformities, analysis of the trends, and the top 5 audit findings for the period.

9.3.2c7 Performance Of External Providers

Performance of external providers (Clause 8.4), e.g., dashboards, scorecards, performance indicators, performance trends, right first time, on time delivery, escapes to the customer, complaint profile, returns/rejections:

  • Minutes and action items from previous supplier performance review
  • Supplier product quality issues
  • Supplier on-time delivery performance
  • Status of supplier corrective action requests
  • Supplier ratings
  • Top 5 issues
  • Top 5 suppliers
  • Bottom 5 suppliers

Discuss issues regarding suppliers of critical materials, hardware, or software. Review supplier performance and any quality or delivery issues. Review open supplier corrective action notices issued since the last meeting. Note any trends for individual suppliers. Indicate changes of supplier status or restrictions.

9.3.2d Adequacy Of Resources

Adequacy of resources (Clause 7.1), including people (number, roles, competency, etc.), infrastructure (buildings, equipment, systems, transport, etc.), working environment (physical and human factors, monitoring and measuring equipment (availability, fit for purpose, maintained):

  • Human resources (Clause 7.1)
  • Infrastructure (Clause 7.1)
  • Work environment (Clause 7.1)
  • Monitoring and measuring resources (measuring instruments) (Clause 9.1)
  • Competence (Clause 7.2)
  • Awareness (Clause 7.3)
  • Communication (Clause 7.4)
  • Documented information, its control, and retention (Clause 7.5)

Consider any changes in the volume and scope of work. Discuss resource needs for each of the following points above.

9.3.2e Effectiveness Of Actions To Address Risks and Opportunities

Effectiveness of actions taken to address risks and opportunities (Clause 6.1), e.g., risk profile, risk register(s), the status of open/closed actions, aging profile of open actions, evaluation of effectiveness:

  • Risk register
  • Internal issues
  • External issues
  • Needs and expectations of interested parties and those needs that relate to climate change
  • Lessons learned

9.3.2f Opportunities For Improvement

Opportunities for improvement (Clause 10.1), corrective action, good practice, best practice, innovation, lessons learned, etc.; recommendations for improvement, including customer-related requirements and resource needs.

Jump Start Your Documentation

Our Management Review Template is proven to work.

• Streamlined Process: Simplifies and organizes the management review process, making it more efficient and less time-consuming
• Compliance Assurance: Ensures your organization meets ISO standards, reducing the risk of non-compliance
• Enhanced Decision-Making: Offers clear insights and data to help in making informed management decisions;
• Comprehensive Documentation: Provides thorough documentation to support audits and certifications
• Continuous Improvement: Facilitates the identification of areas for improvement, driving continuous enhancement of the quality management system
• Performance Tracking: Enables tracking and monitoring of key performance indicators and progress over time

Why not optimize your next quality management review meeting with our template and guarantee ISO 9001 compliance?
icon showing a rocket launching

9.3.3 Management Review Outputs

The outputs of the management review meeting (action items) become inputs to the next meeting. The management review should decide if any corrective action is required and where and when it is necessary.

Any observations, conclusions, and recommendations for further necessary action from the review must be recorded. If any corrective action must be taken, Top management should follow up to ensure that the action was effectively implemented.

Make decisions and take actions based on evidence, balanced with experience and intuition. Even though process owners should address performance issues related to the processes they manage, this requirement gives Top management the clear and ultimate responsibility to address performance issues and ensure the effectiveness of corrective actions and evidence of decisions relating to:

  1. Revised quality objectives
  2. Revised quality policy
  3. Revised KPIs and targets
  4. Process improvement actions
  5. QMS improvement actions
  6. Product and service improvement actions
  7. Resource provision actions
  8. Updated risks and opportunities
  9. Revised business plans and budgets.

It is critical that your organization addresses any quality management system objectives that are not met. These must be discussed during the management review meeting, and a resulting action plan with follow-up dates for checking must be agreed upon and documented in the management review minutes.

These improvement actions are often formulated as objectives with specific, measurable targets, due dates, assignments of responsibilities, and allocation of resources for their implementation.

What should be Included with the Management Review Meeting minutes?

Minutes of management review meetings should be prepared and distributed to the attendees, and, if any, absent managers should also be included. Ensure that the management review meeting minutes are forwarded to those on the distribution list and those with actions from previous meetings.

The meeting minutes from each management review should clearly demonstrate the active involvement of Top management, including:

  1. Being party to critical discussion items
  2. Requests for additional information
  3. Being accountable for the decisions made
  4. Recommending follow-up action, including referral into the corrective action process
  5. Assessing the effectiveness of the quality management system.

Management review meeting output should be documented in the minutes of the review meeting:

  1. Action items are highlighted to ensure that they are easily identifiable
  2. Action items include the assignment of responsibility
  3. Action items include a timeframe and allocation of resources for implementation.

The meeting minutes include, as a minimum:

  • All attendees and apologies
  • Meeting date and location
  • New action items and assigned responsibility
  • Summary of each agenda item
  • Records of decisions and actions relating to:
    • Improvement of the effectiveness of the quality management system and its processes (documented via corrective actions or similar actions):
      • Performance improvement objectives for the organization
      • Performance objectives for processes
      • Loss prevention and mitigation plans for identified risks or new aspects
    • Improvement of product related to customer requirements (documented via continuous improvement projects or similar actions):
      • Performance objectives for products
      • Strategies and initiatives for marketing, products, and the satisfaction of customers and other interested parties.
    • Assessing resource needs:
      • Appraisal of the suitability of the organization’s structure and resources
      • Information for strategic planning for the future needs of the organization.

Whenever applicable, action items include assignment of responsibility, timeframe, and allocation of resources for implementation of the action. All of the management review inputs and outputs are covered in our Management Review Template.

What are the Management Review Meeting Outcomes and Actions?

Close monitoring of management review meeting outcomes and actions (outputs) enables management teams to successfully use the management review process to gain business improvements.

The outcomes and actions from the management review meeting, in the form of decisions arising from the discussion, must be used to identify opportunities and inputs to the improvement process and overall quality management system performance improvement.

The quality management review meeting should also decide if any corrective action is required and where and when it is necessary. The decisions and actions resulting from management meetings are addressed using one or more of the following methods, but not limited to:

  1. Corrective action (CA)
  2. Improvement project (IP)
  3. Minor action items were identified for informal follow-up by the following review meeting

Top management must decide whether or not to change the target goal to make it more achievable and implement improvement in the process. The purpose and final outcome of the management review should be the continual improvement of the quality management system.

Performance will likewise increase as your organization’s management system increases effectiveness and efficiency. Outcomes of the management review meeting must be documented, and any changes to the quality management system must also be communicated to the broader organization by the most appropriate means.

Ensure that actions arising from the management review meeting are noted and that outcomes, such as decisions and actions related to:

  • Opportunities for improvement (Clause 10.1), e.g., read across and implementation of corrective action, good practice, best practice, innovation, lessons learned, etc.
  • Changes to the quality management system, e.g., policies, objectives, processes, procedures, methods, and instructions
  • Resource needs (Clause 7.1), e.g., people (number, roles, training), infrastructure (buildings, equipment, systems, transport), working environment (physical and human factors), monitoring and measuring equipment (availability, fit for purpose, maintained)
  • Identified risks (Clauses 6.1 and 8.1), e.g., adding new risks at an organizational or operational level to the appropriate register(s) and the assignment of responsibility and treatment.

Observations, conclusions, and recommendations for further necessary action from the management review meeting must be recorded. If any corrective action must be taken, Top management should follow up to ensure that the action was effectively implemented.

Whenever applicable, action items include assignment of responsibility, timeframe, and allocation of resources for implementation of the action.

photo of reading glasses and screens of computer code

Management Review Meeting Implementation Checklist

External auditors will expect to see evidence of a more strategically focused management review meeting, where context, risks, and opportunities are considered, as well as the alignment of the quality management system to your organization’s overall strategic objectives. Use this checklist to map your level of compliance with management review meeting requirements.

Management Review Requirements What To Look For
9.3.1 Does Top management review your organization’s quality management system at planned intervals to ensure its continuing suitability, adequacy, effectiveness, and alignment with the strategic direction of your organization?
  • How often are management reviews conducted?
  • Who participates?
  • Is there an agenda for each review?
  • How are the reviews recorded?

9.3.2 Is the management review planned and carried out, taking into consideration the following:

  • What is the status of actions from the previous review?
  • Changes in external/internal issues, including climate change, that are relevant to the quality management system?
  • Feedback from relevant interested parties?
  • To what extent have objectives been met?
  • Process performance and conformity of products and services?
  • Nonconformities and corrective actions?
  • Monitoring and measurement results?
  • Trends in audit results?
  • Performance of external providers?
  • Adequacy of resources?
  • Effectiveness of actions taken to address risks and opportunities?
  • Opportunities for improvement?
  • Are all required inputs provided for each review? 
  • Are there records specifically demonstrating that each input was provided and considered? 
  • Have all actions from the preceding review been closed out? 
  • What happens to actions that have not been fully completed? 
  • How, for example, are recommendations for improvement input into the review? 
  • Who is responsible for making the recommendations? 
  • How are those recommendations considered? 
  • Who decides which recommendations are accepted and which are rejected?

9.3.3 Do the management review outputs include decisions and actions related to opportunities for improvement?

  • Do outputs include decisions and actions related to any need for quality management system changes?
  • Do outputs include decisions and actions related to resource needs?
  • Do you retain documented information as evidence of the results of management reviews?
  • In the last two management reviews, what specific decisions and actions were taken to improve the quality management system and the product?
  • How were they implemented? 
  • Were there any special resources provided to implement the improvements? 
  • Was the implementation verified?

Our Management Review Template inludes a much more detailed implementation checklist.

Related Information You Might Find Useful

Next ISO 9001 Clause

Each ISO 9001 Clause Explained

Don’t Try to Manage It All Alone!

Our ISO Auditors and Quality Manager Trainers have been in this industry for years, and since 2002 we’ve been providing thousands of small businesses and large corporations with the tools they need to get certified.

Instead of trying to create everything you need to follow this process from scratch, use ours. We have procedures, templates, checklists, process maps, forms and gap analysis tools to help you control your documented information without missing a single input or output.

Before you invest all the hours reinventing the wheel, before you spend countless dollars outsourcing the task — try our templates.

quality manager trainers

iso 9001ISO 9001

ISO 9001 Management Review ISO 9001 Management Review Template

Simplify your management reviews and guarantee ISO 9001 compliance with this easy-to-use template.

With this tool, your management review meetings will be flawlessly organized and executed, leaving a lasting impression on top management.

Contents

Key Features

  • Streamlined Process: Simplifies and organizes the management review process, making it more efficient and less time-consuming
  • Compliance Assurance: Ensures your organization meets ISO standards, reducing the risk of non-compliance
  • Enhanced Decision-Making: Offers clear insights and data to help in making informed management decisions
  • Comprehensive Documentation: Provides thorough documentation to support audits and certifications
  • Continuous Improvement: Facilitates the identification of areas for improvement, driving continuous enhancement of the quality management system.
  • Performance Tracking: Enables tracking and monitoring of key performance indicators and progress over time

Optimize your management reviews with our template and guarantee ISO 9001 compliance.

This template is included in our Quality Manual Template.

Management Review ProcedureManagement Review Procedure

  • Defines the process for Management Reviews as well as the responsibilities for planning, conducting, reporting results and retaining associated records - view sample

processProcess Maps

  • Management Review Process Overview (turtle diagram) - view sample
  • Management Review Process Map

ChecklistImplementation Checklist

  • Map your level of compliance with Management Review requirements

Management Review ToolManagement Review Tool

  • MS Excel - view sample
  • Program
  • Agenda Item (Inputs)
  • Action Log (Outputs)
  • Action Tracker, Gantt Chart

chartCharts

  • Dashboard - view sample
  • Ensure schedules are being met and program objectives are being achieved
  • Monitor status in real-time
  • Make issues highly visible

Reports & FormsReports & Forms

PresentationPresentation

  • QMS Management Review Meeting - view sample
  • 21 Powerpoint slides

GuidanceGuidance

  • Everything explained, in-depth guidance - view sample
  • 18 Pages
Written in International English
Fully-editable MS Word or Excel files, compatible with Google Docs and Apple Pages
All the templates use styles – making reformatting and rebranding a breeze
Immediate download
Pay by Credit Card, Debit Card, PayPal or Apple Pay
credit card icon
Credit/Debit Card
paypal icon
PayPal
apple pay icon
Apple Pay

100% Money Back Guarantee

Customers: 132 countries (October 2025)

We are 100% confident in the quality and contents of our products. Used by thousands of organizations around the world, our templates have been sold online since 2002.

If our templates don't help you achieve certification, we'll refund your purchase in full.
No questions asked.

Please read our Money Back Guarantee

money back guarantee 2

Are The Templates Suitable For You?

Bought by Small Businesses and Large Corporations our templates have been sold online in 132 counties for more than 20 years – since 2002.
Used by Small Businesses – dentists, accountants, engineers
Used by Large organizations – hospitals, power plants, aircraft manufacturers
The Templates are used by first-timers following our step-by-step, clause-by-clause guidance documents; and experienced Quality Managers wishing to streamline and improve their existing documentation.
The application of our templates is scalable and generic; regardless of the size and type of organization. The elements that form the quality management system are the same.
Written in International English – our Templates are used Worldwide. The standard of documentation is exactly the same in the U.S. as it is in the U.K., Australia or Dubai.
Iso templates icon

Five Reasons To Choose Our Templates

1. Our customizable templates save you time and money by offering a streamlined process to create your quality documentation
2. They’ve got everything you need in one simple template
3. Proven to work our templates have helped thousands of businesses big and small achieve certification
4. Documents use styles to make reformatting and rebranding a breeze
5. Our templates are generalizable for any industry or sector. The application of our templates is scalable and generic; regardless of the size and type of organization.